After a long time planning and building, MR CHAIN is happily settling into our new offices. 

In order to consolidate our operations in one place, M R Products has built new corporate offices inside the footprint of our factory. It was a challenge to fit everything we needed inside our existing building, but with the help of Fred Campbell of JML Design Group, LTD of Traverse City, we were able to come up with a plan to fit six offices, a conference room, lunchroom, two restrooms, copy room, and mechanical room - all within our existing facility. This also meant we had to relocate our old quality control and maintenance areas to other parts of the factory. 

The actual construction began in June and ended in September. Robert T. Cole of Cadillac, MI was our General Contractor. 

Besides saving on rent, the move also allows us to have all our employees in one place, which is much more efficient, allows better direct communication, and should allow us all to focus on what we like to do best at M R Products - produce quality plastic chainplastic stanchions, and lawn and garden products for our industrial and retail customers.